STAGE 01< 0.2ms
Physical Sensor Layer
GigE Vision v2.1, CoaXPress 2.0 (12.5 Gbps), and Solid-State FMCW LiDAR raw packet stream synchronization via IEEE 1588 PTP.
PROTOCOL: CXP-12 QUAD
STAGE 020.8ms
Edge Compute Unit
Dual NVIDIA Jetson AGX Orin 64GB clusters or custom Xilinx FPGA accelerators performing zero-copy DMA memory transfer.
COMPUTE: 275 TOPS INT8
STAGE 031.4ms
Neural Filter & NeRF
Pruned vision transformers executing spatial classification, segmentation masks, and micro-metric boundary validation.
INFERENCE: FP8 / INT4 MIXED
STAGE 040.6ms
PLC / SCADA Signal
Hard real-time deterministic Ethernet/IP, ProfiNet IRT, and EtherCAT packet broadcast directing pneumatic ejectors and robot arms.
JITTER: < 15 MICROSECONDS
SYSTEM_LOG // STREAM_ORIN_A1STATUS: DETERMINISTIC_SYNC
[00:00:01.002] CAMERA_ARRAY_SYNC: CXP_PORT_0..3 LOCKED @ 1200 FPS // FRAME_ID: #89422019[00:00:01.003] TENSOR_INFERENCE: MicroDefectNet_v4 latency=1.24ms // 0 Anomaly in die substrate[00:00:01.004] SLAM_EXTRAPOLATION: Pose delta dx=+0.001mm dy=+0.000mm dz=-0.002mm // 6-DOF Covariance nominal[00:00:01.005] BUS_DISPATCH: EtherCAT packet transmitted to Beckhoff CX2040 // Cycle ACK received (0.12ms)